A construction permit is required prior to the initial erection and commissioning of temporary structures. In order for the construction permit to be granted, the technical documentation, the manufacturing process and the completed structure must be inspected.
You cannot save the application as a draft. You should therefore have all the necessary information to hand before you start processing it.
The technical documentation must be signed by the author of the design and bear the current date.